Term: 07.03.2018 - 27.04.2018
Applicants: natural and legal persons (including municipalities) from the particularly polluted Bavarian cities: Munich, Nuremberg, Augsburg, Regensburg and Würzburg
Subject of funding: Construction of the charging station, grid connection and installation
Funding rate: Normal charging points (up to and including 22 kW) with a share of 40% (up to a maximum of € 3,000 per charging point), grid connection per location with a share of 40% (up to a maximum of € 5,000 for the connection to the power grid). If the charging station offers additional added value, eg park & ride parking or e-car / e-bike sharing, the funding rate can be increased by 10%.
Prerequisites: publicly accessible charging station, operation of the charging station with electricity from renewable energy, minimum operating time of 6 years, compliance with the requirements of the charging station ordinance