1st call for funding "Charging infrastructure for electric vehicles in Bavaria

Term: 01.09.2017 - 27.10.2017 Applicants: natural and legal persons (including municipalities) Subject of funding: Construction of the charging station, grid connection and installation Funding rate: Normal charging points (up to and including 22 kW) with a share of 40% (up to a maximum of 3.000 € per charging point), grid connection per location with a share of 40% (up to a maximum of € 5,000 for the connection to the grid) Prerequisites: publicly accessible charging station, operation of the charging station with electricity from renewable energy sources, minimum operating time of 6 years, compliance with the requirements of the charging station regulation 