Term: 01.09.2017 - 27.10.2017
Applicants: natural and legal persons (including municipalities)
Subject of funding: Construction of the charging station, grid connection and installation
Funding rate: Normal charging points (up to and including 22 kW) with a share of 40% (up to a maximum of 3.000 € per charging point), grid connection per location with a share of 40% (up to a maximum of € 5,000 for the connection to the grid)
Prerequisites: publicly accessible charging station, operation of the charging station with electricity from renewable energy sources, minimum operating time of 6 years, compliance with the requirements of the charging station regulation