A Diverse Energy Mix for Greater Resilience
The facility combines a combined heat and power plant, biomass, heat pumps, solar thermal energy, and thermal storage to efficiently utilize various heat sources and ensure a long-term supply.
November 16, 2026
Source: E & M powernews
Stadtwerke Landshut has built an energy center featuring a combined heat and power (CHP) unit, a biomass boiler, heat pumps, and solar thermal systems, complete with a heat storage tank. There’s a reason for this.
By utilizing a mix of different generation technologies, the municipal utility aims to expand its district heating supply and reduce its dependence on individual energy sources. A new energy center was therefore built in the “Münchnerau” industrial park on the outskirts of the city. The municipal utility spent 11.5 million euros on the project.
Even though the opening of a kindergarten makes for a more impressive event than the official commissioning of a simple, functional building housing energy systems, the number of local dignitaries in attendance at the official opening of the energy center on November 12 was quite remarkable. In addition to the mayor of Landshut, several city council members and representatives from the district also stopped by.
And there was—and still is—quite a bit to see inside the building. Particularly noteworthy is the wide variety of systems on site. The new energy center combines a combined heat and power (CHP) unit (1 MW thermal/800 kW electrical, fueled by natural gas), a biomass boiler (900 kW thermal, wood chips), two heat pumps (1.3 MW thermal), and a solar thermal system (50 kW thermal).
The two heat pump cascades utilize, among other things, groundwater and low-temperature heat. The cascade configuration allows the temperature to be gradually raised to the level required for district heating.
Michael Müller, Head of Generation and Bathing Services at Stadtwerke Landshut, explained the reasons for this technology mix in an interview with *Energie & Management*. By combining different systems, both groundwater heat and previously unused low-temperature heat can be harnessed for district heating.
In addition, the diversity of the technologies used reduces dependence on individual energy sources and increases the resilience of the supply. “That’s an important factor for us,” Müller emphasized. For example, the wood chip boiler can also utilize fuels from local agriculture and forestry. Nevertheless, he acknowledged that coordinating the numerous systems is quite challenging.
Integrating Heat Pumps Is a Challenge
A buffer storage tank with a capacity of 1,000 cubic meters plays a central role. It is designed for the district heating network with a temperature level of 85 degrees Celsius. Another storage tank with a capacity of 80 cubic meters and a temperature level of 45 degrees Celsius serves the heat pump cascades.
From a technical standpoint, integrating the heat pumps in particular presented challenges for the municipal utility. The most demanding aspect here was coordinating the control of the various temperature levels, Müller said. Added to this was the space required for the plant’s equipment. For this reason, the building was constructed with multiple stories.
The energy center is already prepared for expansion. There is space for two additional CHP units, another biomass boiler, and an additional heat pump system. The municipal utility plans to add these components in line with future heat demand. Also important: The CHP unit is designed to operate with biomethane as well as hydrogen blends or green hydrogen.
Initially, the energy center will supply the Münchnerau industrial park. To date, the “Landshut West” district heating network has been an independent supply area. The municipal utility operates another district heating network in the eastern part of the city, which is fed by a large biomass cogeneration plant.
By 2028, the municipal utility plans to connect the two networks—West and East—with one another. Route planning is already underway. This merger would allow additional city districts to be connected to the district heating supply. At the same time, the various generation plants can be controlled jointly and utilized based on heat demand and the availability of energy sources.
The new energy center is therefore designed to handle a higher heat output than the Münchnerau industrial park currently requires on its own. Thanks to its modular design, generation capacity is intended to grow gradually in line with demand. In this way, the municipal utility aims to avoid having to build and finance all planned facilities right from the start.
Author: Stefan Sagmeister