Funding program for charging infrastructure for electric vehicles in Bavaria 2026-2029

No applications can currently be submitted. The first application window is expected in the first half of 2026.

What are the main requirements that must be met?

Despite the flexibility of the guideline, the calls for funding generally require the following funding specifications and conditions, among others:

  • Charging location in Bavaria
  • No early start of measures. The award of a delivery or service contract attributable to the execution is deemed to be the start of the measure.
  • No funding for expenditure outside the respective project duration
  • No funding for own contributions
  • Prohibition of accumulation
  • Construction and installation of the subsidized charging points by qualified personnel
  • Funding notice at the charging point (sticker provided)
  • Regular reporting

How do I apply for funding?

The application procedure is a one-stage process. Applications are submitted via the project management organization's electronic application system (see links below). As a rule, applications are not processed on a first-come, first-served basis, but according to a selection process defined in the respective call for funding.

If you have any questions about the funding program, please contact us at the e-mail address: Contact by mail

Contact Application and processing

Julian Schwenda
+49 911 20671-643
Projektträger, Projektorganisation, Bayern Innovativ GmbH, Nürnberg
Sara Thierauf
+49 911 20671-237
Projektträger, Projektassistenz, Bayern Innovativ GmbH, Nürnberg
Birgit Schabesberger
+49 911 20671-618
Projektträger, Projektassistenz, Bayern Innovativ GmbH, Nürnberg

Contact Content and orientation

Dr. Guido Weißmann
+49 911 20671-251
Innovation network Mobility, Head of Electromobility, Bayern Innovativ GmbH, Nuremberg
Porträt von Simone Hirschmann
Simone Hirschmann
+49 911 20671-226
Innovation network Mobility, Project Manager, Bayern Innovativ GmbH, Nuremberg