Term: 02.12.2019 - 14.02.2020
Applicants: natural and legal persons (including. Municipalities)
Subject of funding: Construction of the charging station, grid connection and installation
Funding rate: Normal charging points (from 3.7 kW up to and including 22 kW) with a share of 40% (up to a maximum of € 3,000 per charging point), grid connection per location with a share of 40% (up to a maximum of € 5,000 for the connection to the power grid). If the charging station offers additional added value, eg park & ride parking or e-car / e-bike sharing, the funding rate can be increased by 10%.
Prerequisites: publicly accessible charging station, operation of the charging station with electricity from renewable sources, minimum operating time of 6 years, compliance with the requirements of the charging station ordinance
Approval procedure: Applications from counties and independent cities with a special need for action are given priority for approval.
Commencement of Action: An early commencement of action is detrimental to funding. All commissions, orders or procurements prior to receipt of the positive funding decision and outside the "build-up period" named in the funding decision cannot be funded. The automatic confirmation of receipt of the application is not a funding commitment or a funding notice.